10/06/1996: Grand opening
06.10.19962010-2011: Construction of the first railway loading arm
01.01.2010New technical solutions at the refinery were introduced in 1998-2001. The main goal is to increase the octane number of produced gasoline.
New technical solutions at the refinery were introduced in 1998-2001. The main goal is to increase the octane number of produced gasoline.