Charity of the KPC in orphanages22.03.20182019: Construction of a weighbridge (80 tons)01.07.2019 01.01.2019 Installation of two tanker tanks (TK 317 and TK 318), with a volume of 2000 cubic meters. m. each Related posts01.07.20212021: Construction of checkpoint No. 3Read more01.02.20212021: Construction of a canopy over the weigh station and improvement of the parking lot for tank trucks of JSC KPCRead more01.01.20212021: Commissioning of two tanker tanks (TK 317 and TK 318)Read more