2011-2012: Construction of two tanker tanks
01.01.20122013-2014: Reconstruction of the oil refinery boiler room with a capacity of 3 t/p per hour.
01.01.2013On this day, all the necessary documents for the purchase of Kyrgyzneftegaz OJSC 50% of the shares owned by Petro Kyrgyzstan LTD were fully completed. Thus, Kyrgyzneftegaz OJSC became the sole shareholder of Kyrgyz Petroleum Company CJSC.