![](https://kpc.kg/wp-content/uploads/2024/03/2010-2011-2.jpg)
2010-2011: Construction of a boiler room at a refinery
01.01.201110/06/2012: Sole shareholders
06.10.2012Construction of two tanker tanks (TK 315 and TK316), each with a volume of 2000 cubic meters. m.
Construction of two tanker tanks (TK 315 and TK316), each with a volume of 2000 cubic meters. m.