2011-2012: Construction of two tanker tanks
01.01.2012![](https://kpc.kg/wp-content/uploads/2024/03/2013-2-14-min.jpg)
2013-2014: Reconstruction of the oil refinery boiler room with a capacity of 3 t/p per hour.
01.01.2013On this day, all the necessary documents for the purchase of Kyrgyzneftegaz OJSC 50% of the shares owned by Petro Kyrgyzstan LTD were fully completed. Thus, Kyrgyzneftegaz OJSC became the sole shareholder of Kyrgyz Petroleum Company CJSC.