
2010-2011: Construction of the first railway loading arm
01.01.2010
2011-2012: Construction of two tanker tanks
01.01.2012Construction of a boiler house at a refinery with a capacity of 3 t/p per hour.
Construction of a boiler house at a refinery with a capacity of 3 t/p per hour.